
01After
New stack with corbelling
This stack was rebuilt during a re-roof. The stepped-out corbel courses near the top throw rainwater clear of the brickwork below.

Two chimney stacks rebuilt from scaffolding: one in new brick with corbelled courses and a single pot, and one in reclaimed brick with four clay pots re-bedded on new flaunching.
The story

01After
This stack was rebuilt during a re-roof. The stepped-out corbel courses near the top throw rainwater clear of the brickwork below.

02After
The pot is bedded in mortar flaunching, sloped so water runs off the top of the stack.

03After
On the second job the stack was rebuilt in reclaimed bricks to suit an older property, and the four original clay pots were re-bedded.

04After
New lead flashing seals the joint between the stack and the roof.
More work
Get a quote
Call Andrew Martin or send a few details and photos, and we will arrange a visit to look at the job and give you a written quote.
07876 762956