A patchy front garden of gravel, grass and old paving was dug out and rebuilt as a full-width charcoal block paving driveway in herringbone pattern, on a new compacted sub-base with a kerbed edge.

Completed
November 2026
Surface
Charcoal concrete block paving
Pattern
45° and 90° herringbone with a double border
Photographed over
9 days, first dig to finish

Before & after

Drag to compare

Finished charcoal block paving driveway laid in herringbone pattern in front of a detached house with sage green garage doors
Front garden before a new block paving driveway, with patchy gravel, old paving and a mini digger ready to start
Before: a tired mix of gravel, grass and old paving. After: a full-width charcoal herringbone driveway.

The story

Step by step

Front garden before a new block paving driveway, with patchy gravel, old paving and a mini digger ready to start
Before: a tired mix of gravel, grass and old paving.

01Before

Before

The front of the house had a narrow block path, a strip of old concrete and a worn mix of gravel and grass. It offered parking for one car at best.

Driveway excavation with the old surface dug out by mini digger ready for a new sub-base
Day one: the old surface is dug out to formation level.

02In progress

Excavation

The whole area was dug out with a mini digger to a consistent depth, removing turf, topsoil and the old surfacing so the new driveway would sit on firm ground.

Compacted hardcore sub-base for a block paving driveway, levelled across the full width of the front garden
The sub-base goes in and is compacted in layers.

03In progress

Sub-base

Hardcore was spread across the full footprint and compacted. This layer carries the weight of vehicles, so it is what stops a driveway sinking or rutting later.

Block paving driveway at edging stage, with a charcoal border course bedded in concrete around the prepared sub-base
Edge restraints and the border course are set first.

04In progress

Edges and border

A concrete kerb was set along the footpath and the charcoal border course bedded in concrete around the perimeter. Edge restraints stop the paving spreading under load.

First rows of charcoal block paving laid beside a garage, with bulk bags of aggregate on the sub-base behind
The first blocks go down along the garage.

05In progress

First blocks

Laying started against the garage on a screeded bed of sharp sand, keeping the lines square to the house.

Charcoal block paving being laid in a herringbone pattern on screeded sharp sand, with cut-in gaps left along the border
Herringbone laying on a screeded sand bed, cuts still to do.

06In progress

Herringbone laying

The field was laid in a herringbone pattern, which locks the blocks together and resists the turning forces of car tyres. Gaps along the border were left for cut blocks.

Finished charcoal block paving driveway laid in herringbone pattern in front of a detached house with sage green garage doors
After: a full-width charcoal herringbone driveway.

07After

After

With the cuts in, the surface was compacted and kiln-dried sand brushed into the joints. The finished driveway spans the full width of the plot.

Completed charcoal block paving driveway seen from the pavement, with a neat concrete kerb edge to the footpath
The finished surface meets the footpath on a clean kerb line.

08After

Kerb line

From the pavement, the kerb gives a clean, straight edge between the new paving and the public footpath.

Charcoal block paved driveway viewed from the house towards the road, showing the double border course
Looking back to the road: the border frames the herringbone field.

09After

Border detail

Looking back towards the road shows the double border course framing the herringbone field.

New charcoal block paving driveway in autumn sunshine, running up to the garage and front door
Jointing sand brushed in and the drive ready for use.

10After

Ready to use

The completed driveway the following morning.